The project includes the construction of an artificial grass playground with a total area of 10,000 m², executed in accordance with FIFA specifications and the client’s technical requirements.
The artificial turf system fully complies with ISO 9001 quality standards and ISO 14001 environmental requirements, and includes a complete drainage system to ensure durability and optimal field performance.
The project scope also comprises:
- Administration Building (reinforced concrete structure)
- Spectator Stands with Roofing (steel structure)
All civil, electrical, mechanical, and plumbing (MEP) works were completed within the approved contractual time frame, in full accordance with the required specifications and international standards.