The project has a total built-up area of 24,000 m², and includes the construction of the reinforced-concrete skeleton of the BCH Main Hospital Building (three floors), with the installation of 12,265 precast piles.
The project was executed as a joint venture with MID International Contracting (Jordan) and UHS (Universal Hospital Services) acting as the healthcare planner and medical equipment supplier.
The scope of work includes the following key components:
1. Main Hospital Building:
Construction of the full structural, architectural, and utility works.
2. Medical and Technical Departments:
- CSSD Department with complete sterilization equipment.
- Linear Accelerator Room with dedicated entrance for radiotherapy services.
- Main Operating Rooms within the Surgery Department.
- Endoscopy Unit and Dental Treatment Rooms within the Outpatient Department.
- Comprehensive Laboratory Facilities including:
- Serology Laboratory
- Chemistry Laboratory
- Microbiology Laboratory
- Histopathology Unit
- Radiographic Department equipped with diagnostic imaging rooms.
3. Residential and Ancillary Buildings:
Including staff housing and supporting service structures.
4. External Works:
Development of internal road networks, parking areas, and complete landscaping works around the hospital complex.