Completed Projects – Past Performance

Project Name Project Brief Description Location Client Year Gallery
Al Khassaki Residence 1 Al Khasaky Residence 1 Is a new modern building located in the heart of the capital of Iraq - Baghdad - Arasat Al-Hindiya district / Karada province. The building consists of four floors, each floor contains two apartments, each apartment is of 150 square meters area. The Apartment contains:

• Large guests room.
• Dining room.
• Two bedrooms / one of them is the Master bedroom with bathroom).
• Open modern kitchen.
• Bathroom.
• Store.
• Balcony.
Baghdad

Dr. Mohammed Al-Khasaky Chairman & CEO  AKG Group

2023
Diwaniyah Asphalt Plants Supply/install 2 Asphalt plant, Latest technology in Asphalt production utilizing MARINI (Italy) technology with production capacity of 180-200 ton/hour. Diwaniyah

Governorate of Diwaniyah

2022
Construction of Paralympic  Headquarter

Construction of the Paralympic committee head quarter with an area of 3304 m2 using concrete structure and according to the designs approved by the beneficiary, Apply all external and internal finishes and all the used materials are subjected to tests and approved by the beneficiary. Complete all the Civil, Electrical, Mechanical & Plumbing works and completion of the project within the previously approved time frame mentioned in the contract.

Baghdad Ministry of Youth & Sport 2021
AL-Khassaki Medical Complex It is a building located in the heart of the commercial district in the capital, Baghdad Raghba Khatoun district/ Adhamiya
The medical complex building consists of five floors, each floor is 65 square meters area. designed for the purpose for which it was established, and contains integrated medical services, Composed of:
* A Medical laboratory and pharmacy on the ground floor.
*Eight medical clinics spread over four floors, with two clinics in each floor) of which two clinics are equipped for dentists.
*The complex contains an elevator, air-conditioning system and monitoring cameras, in addition to a fire sensor system, a firefighting system, a satellite system, and an Internet system. The building is connected to an alternative electrical power service, guard services and building security
Baghdad

Dr. Mohammed Al-Khasaky Chairman & CEO  AKG Group

2022
Lebanese Village  (Eight Towers G+10 to G+ 26) Construction of the concrete structure for multi stories buildings for Lebanese village project (Eight Towers G+10 to G+ 26) with an area of 40,000 m2 using concrete structure and according to the designs approved by the beneficiary, Complete all the Structural, works and completion of the project within the previously approved time frame mentioned in the contract. Erbil

HARCO  Investment Group Company

2013
DISASTER EMERGENCY READINESS TRAINING CENTER Construction of the Disaster Emergency Readiness Training Center with an area of 5000 m2 using concrete structure and according to the designs approved by the beneficiary, Apply all external and internal finishes and all the used materials are subjected to tests and approved by the beneficiary. Complete all the Civil, Electrical, Mechanical & Plumbing works and completion of the project within the previously approved time frame mentioned in the contract including furniture and 156 seat general purpose theater. Baghdad

Ministry of Health & WHO

December 2013
Artificial Grass Playgrounds- Al Hussayneya Project Construction of artificial grass playground with area of 10000 m2 according to the specification of FIFA and the client requirements, artificial grassing identical to ISO 9001, 14001enviroment requirements, including the drainage system, and the administration building (concrete structure), the stands with roofing (steel structure). Complete all the Civil, Electrical, mechanical & Plumbing works and completion of the project with in the previously approved time frame mentioned in the contract. Baghdad

Ministry of Youth & Sport

December 2013
Artificial Grass Playgrounds- Al
Tahady Project.
Construction of artificial grass playground with area of 10000 m2 according to the specification of FIFA and the client requirements, artificial grassing identical to ISO 9001, 14001 environment requirements, including the drainage system, and the administration building (concrete structure), the stands with roofing (steel structure). Complete all the Civil, Electrical, mechanical & Plumbing works and completion of the project within the previously approved time frame mentioned in the contract. Baghdad Ministry of Youth & Sport November 2013

Artificial Grass Playgrounds -

Al Wehda Project

Construction of artificial grass playground with area of 10000 m2 according to the specification of FIFA and the client requirements, artificial grassing identical to ISO 9001, 14001enviroment requirements, including the drainage system, and the administration building (concrete structure), the stands with roofing (steel structure). Complete all the Civil, Electrical, mechanical & Plumbing works and completion of the project within the previously approved time frame mentioned in the contract. Baghdad

Ministry of Youth & Sport

October 2013
DBE Ramadi Iraqi border security headquarters compound The scope of works covers Design & Build and the construction of Vehicle Maintenance Facility, Headquarter Building, Fuel Distribution Facility, Officers Quarters, NCO Quarters, Enlisted Barracks, Ablution & Laundry Facility, Dining Facility, Classroom, Warehouse Building, Commander Quarters, Deputy Commander Quarters, Guard Tower, Back Up Power Building and Lagoon including all roads & landscaping. Al Anbar

Ministry of Defense (FGA & US Corps of Engineers)

2011
Main Laboratories Building  for “SIEI” Steel structure frame with brick wall with full finishing including electrical, mechanical and HVAC works. Baghdad

Ministry of Industry & UNIDO

 

2011
Basrah Children Hospital

The built up area is 24 ,000 M2 which consists of constructing the reinforced concrete skeleton of BCH main building (three floors) including construction of 12265 precast piles. The project executed as a joint venture with MID international Contracting (Jordan) & UHS (Universal Hospital Services) as a health planner and medical supplier, the project Includes main hospital building, CSSD department and sterilization equipment, Linear accelerator room and entrance, main operating rooms in the surgery department, endoscopy room in the outpatient department, dental treatment room in the outpatient department, serology laboratory in the main laboratory department, chemistry laboratory in the main laboratory department, microbiology laboratory, histopathology, radiographic room. The project include residential and ancillaries with all roods and landscaping.

Basrah

Mistry of Health (Directorate of Basrah ) & Bechtel,USA

2009
Works for vehicles maintenance workshop at the mechanical directorate

Works for pre-cast reinforced concrete workshop Works for coating the ceiling with “Kirby” Works for Reinforced concreting of the mechanical directorate ‘s ramp Works for concreting of floors
Works for brick building of the walls Works for door and windows Works for internal and external finishing Works for electrical

Basrah

Ministry of Industry & Bechtel, USA

2006

Al Sader Water station

Maintenance of stations and rehabilitations of its sewage pump stations

Baghdad

Baghdad Municipality

 

2004

AL-KARRADA district’s main sewage station

Works for maintenance station and rehabilitations of AL-KARRADA district’s main sewage station Baghdad

Baghdad Municipality & US CORPS of Engineers

2004

Al-Shurooq Nursery

Rehabilitation of buildings for civil and MEP works Baghdad

Ministry of Education & US CORPS of Engineers

 

2003

Bur-Saeed Primary School

Rehabilitation of buildings for civil and MEP works Baghdad

Ministry of Education & US CORPS of Engineers

2003

Eastern Secondary School for Girls

Rehabilitation of buildings for civil and MEP works Baghdad

Ministry of Education & US CORPS of Engineers

2003

Workshop of 
IBN- IL WALEED Project

Reinforced concreting work for foundation Reinforced concreting work for column and connecting beams Iron structure works for workshop’s ceiling Work for “Kirby” Coating of the ceiling Brick building of outer walls Reinforced concreting work for floor Mechanical works for workshop of overhead crane

Baghdad

Ministry of Industry

2002

Al Quds Power Station

Electro-Mechanical & Civil Works including foundations for turbine, transforms, main control building, restaurant and ancillary building.

Baghdad

Ministry of Electricity & Shanghai China

2001

Kreyat City Water Sewage and pavement    (42 KM) Baghdad Municipality

Water & sewage network and curbstone with 42 KM pavement. Baghdad

Baghdad Municipality

 

2001  

Al Amin Sub Station

Electro-Mechanical, Civil Works Foundation, trenches, concrete partitioning walls for transformer yard   and main control building.

Baghdad

Ministry of Electricity & Schneider Germany

2000

Clean Rooms

Construction of 200M2 clean rooms divided into three zones according to clarity requirements, including all air tight doors, portioning walls , special doors , false floors and ceiling. Baghdad

Ministry of Industry

2000